Sign Permits
A sign permit is required to install, construct, alter, relocate or reconstruct any sign.
Prior to submitting a sign permit application, applicant shall verify use of space. If the use of the space is the same as the existing/previous use, you may submit a sign permit application. If the use is not permitted, a building permit application is required prior the submission of a sign permit application.
To ensure a smoother process for both applicants and staff, applicants should review the new 2025 SIGN Permit Plan Format Checklist before submitting an application. The purpose of this checklist is to standardize plans submitted for a City and County of Honolulu permit. If the minimum information is not provided, plans review may not be completed in a timely manner. Failure to meet any checklist item will result in rejection of drawings and require re-submission.