Road Rehabilitation Project

King Street showing part of the bus lane in front of the Fasi Building on a bright sunny day

About the Project

The Rehabilitation of Streets Project (Unit 65D) will improve concrete pavement conditions, such as bus lanes, in key downtown areas.

Project Scope

Spot reconstruction within concrete bus lane, resetting/reconstruction of curbs, and the restoration/installation of vehicle detector loops and pavement markers, striping and markings.

Project Schedule

The work is anticipated to commence in early 2027 with construction expected to last approximately one year. 

Project Locations:

  • North King Street:  Liliha St / Dillingham Blvd → North King St Bridge No. 1 (over Nuʻuanu Stream)
  • South King Street: Bethel St → Alapa‘i St / South St
  • Hotel Street:  River St → Richards St
Map showing the limits of the proposed concrete repair work on King Street and Hotel Street. The map shows the location of North King Street on the left (Eva) and South King Street on the right (Diamond Head), Hotel Street and North Beretania Street which run above King Street. Hotel Street is intersected by Bethel Street and Richards Street on the right (Diamond Head). Alapa‘i Street meets up with South King Street. Kapi‘olani Boulevard connect to South King St. Bridge No. 1 marks the start of the project limit on North King St. Kapi‘olani Boulevard also connects to South St. Dillingham Boulevard meets up with North King Street and Liliha St where the project limit ends. Honolulu Harbor is outlined at the bottom of the map.

Map showing the project limits (highlighted in orange)

Community Noise Variance 

The City requested a noise variance from the State Department of Health to allow construction activities to exceed maximum permissible sound levels outside of normal permitted hours. The request was approved after the City completed all required public notification procedures. A public meeting was held on October 9, 2025, and businesses and residents within the project area were notified and provided an opportunity to submit public comments.

The proposed nighttime work will help reduce traffic impacts and shorten the overall project duration, thereby minimizing long-term disruption to nearby residents and businesses. Approved hours include Monday to Friday (midnight to 4 am and 7 pm to 11:59 pm), Saturday (6 pm to midnight), and Sunday (midnight to 4 am and 7 pm to 11:59 pm). 

Lane Closures & Bus Detours

Work is expected to take place during the day, but the contractor will be allowed to work at nights and weekends to condense the overall project timetable. While lane closures are expected during the work, we will be working closely with the contractor to minimize disruptions. We will also be coordinating with the Department of Transportation Services for any necessary lane closures and detours for buses.

FAQ

What does the project work involve, and why is it needed?

This project is needed to ensure continued safe roadway conditions for all road users, including motorists, pedestrians, bicyclists, as well as our city bus operations. The work will include, but not be limited to, spot reconstruction of concrete bus lane pavement, resetting/reconstruction of curbs, installation of vehicle detector loops and pavement markings, and roadway striping.

Work is anticipated to begin around summer 2027 and last approximately one year.

Work is expected to take place daily during daytime hours, including weekends. The contractor will also be allowed to work at nights to condense the overall project timetable.

Yes, lane closures will be conducted in phases. While lane closures on King Street and Hotel Street are expected during the work, the City will work closely with the contractor to minimize disruptions.  

The City’s Department of Design and Construction (DDC) has conducted community outreach for the project by reaching out to area businesses along the route and notified the Downtown-Chinatown Neighborhood Board about the upcoming work. Additional planned notifications include notifications to be issued to residents and businesses prior to start of construction. The community feedback especially from businesses will help the City ensure that the construction work will minimize disruption and continue to allow customer and delivery access to their locations.

Yes. Sidewalk access for pedestrians and driveway access for vehicles will be maintained throughout construction.  The contractor will be required to coordinate closely with area businesses as work moves along the construction route.

Noise/dust impacts should be anticipated. The Contractor will implement standard noise/dust control mitigation measures. 

There may be temporary bus stop relocations on King Street and bus route detours for the Hotel Street bus mall. DDC will coordinate closely with the City’s Department of Transportation Services (DTS) for these bus service impacts, which will be announced prior to construction.

The City’s Unit 65 D project website will be the primary resource for updated information during construction. DDC has been coordinating bus service impacts with the Department of Transportation Services (DTS). Any bus-related questions may be directed to thebusstop@honolulu.gov. The City will also issue press releases, notify local media, and post notices at affected bus stops.

The work will be phased so construction work fronting your business will last a few weeks and not for the entire construction duration. For example, while roadwork will affect both travel lanes on Hotel Street, the work will be phased so that only one lane (one direction) would be closed at a time. On King Street, the bus lane would also be constructed in segments.

Knowing that those community events are critical to Downtown/Chinatown businesses, the City will work with the contractor to avoid or minimize road/lane closures during such event days and times. If you are concerned about a particular event, the City welcomes you to contact and inform DDC of that event.

As the City nears the start of construction, the City’s Unit 65 D project webpage will be the primary resource for updated information. Once construction starts, phone hotlines for noise-related and non-noise-related questions will be made available. The hotline for noise-related questions will be available 24/7. DDC will also provide any lane closure updates to the media as needed. 